Accessibility of Structures, exporting the structure to manipulate the data in XLS
Mexican Petroleum Fund | |||||||||
Contractual price of hydrocarbons, license contract RF-C015-2016-016\1 |
Period | Fiduciary register number of the contract | Contractor's fiduciary register number | Contract register number assigned by the CNH | Oil | Condensates | Natural Gas \2\3 | |||
Methane | Ethane | Propane | Butane | ||||||
Dollars per barrel | Dollars per million BTUs | ||||||||
Sep‑23 | RF-C015-2016-016 | C015 | CNH-R01-L03-A18/2015 | N/E | 32.3 | 1.6 | 2.8 | 3.9 | 5.1 |
Oct‑23 | RF-C015-2016-016 | C015 | CNH-R01-L03-A18/2015 | N/E | 33.1 | 1.6 | 2.8 | 4.0 | 5.2 |
Nov‑23 | RF-C015-2016-016 | C015 | CNH-R01-L03-A18/2015 | N/E | 35.7 | 1.7 | 3.0 | 4.3 | 5.6 |
Dec‑23 | RF-C015-2016-016 | C015 | CNH-R01-L03-A18/2015 | N/E | 33.6 | 1.6 | 2.9 | 4.1 | 5.3 |
Jan‑24 | RF-C015-2016-016 | C015 | CNH-R01-L03-A18/2015 | N/E | 33.5 | 1.6 | 2.8 | 4.0 | 5.2 |
Feb‑24 | RF-C015-2016-016 | C015 | CNH-R01-L03-A18/2015 | N/E | 36.9 | 1.9 | 3.4 | 4.8 | 6.3 |
Source: FMP calculations with information from contractors, CNH, CRE and SHCP. | |||||||||
(N/E = data not available) | |||||||||
\1 Figures subject to review. | |||||||||
\2 Natural gas does not include nitrogen or self-consumption. | |||||||||
\3 At the point of sale there is no distinction between associated and non-associated natural gas; therefore, only natural gas is reported. |